Delivery Schedule :
Maximum 3 Days For Quality And Sampling Inspections In Factory
Maximum 1 Week For Transport To Loading Port
2 Days For SGS Quantity Inspections And SGS Sealing, Customs Sealing And Customs Clarify
Maximum 5-35 Days To Deliver In You Destination Port (based on distance and shipping line)
Iran Bitumen Delivery Schedule
Delivery Terms :
1- CIF : Cost, Insurance and Freight (Most Africa, Asia, Middle Eaast Destinations)
Isfahan Bitumen Production will arrange for the carriage of insured goods by sea to a port of destination, and provide the buyer with the documents necessary to obtain the goods from the carrier.
2- CNF / CFR : Cost and Freight (Most Africa, Asia, Middle Eaast Destinations)
Isfahan Bitumen Production will arrange for the carriage of goods by sea to a port of destination, and provide the buyer with the documents necessary to obtain the goods from the carrier. Under CFR, the seller does not have to procure marine insurance against the risk of loss or damage to the goods during transit.
3- EXW : Ex Works (Isfahan City / Iran)
Isfahan Bitumen Production will deliver goods at place of factory in Isfahan Segzi Industrial Area. All other transportation costs and risks are assumed by the buyer.
4- FOB : Free On Board (Bandar Abbas Port / Iran , Bushehr Port / Iran)
Isfahan Bitumen Production will deliver goods on board a vessel designated by the buyer. The seller fulfills its obligations to deliver when the goods have passed over the ship’s rail.
The word “free” means the seller has an obligation to deliver goods to a named place for transfer to a carrier.
5-FOT / CIP : Free on Truck – Carriage and Insurance Paid to (Iran’s Neighbors)
Isfahan Bitumen Production will arrange for the trucks of insured goods by ground to a neighbor destination.
6- FOR : Free on Rail (Iran’s Neighbors)
Isfahan Bitumen Production will deliver goods to Isfahan railway station and loaded onto a train and deliver at buyer’s railway station.
Iran Bitumen Delivery Terms